Home  /  Manpower Supply  /  Masons

Mason Manpower Supply in the UAE

Block masons, plaster masons and tile masons for towers, villa communities, refurbishment and fit-out — supplied with helpers so the work keeps moving.

Choosing right

Which kind of mason do you need?

“Mason” covers several trades on a UAE site, and sending the wrong one wastes a day. Tell us which:

  • Block mason — hollow and solid concrete blockwork, lintels, openings, setting out walls to drawings.
  • Plaster mason (plasterer) — internal and external cement plaster, render, corner beads, levelling for paint.
  • Tile mason — floor and wall tiling, porcelain and ceramic, marble, skirting, grouting; wet areas and waterproofing coordination.
  • Screed / finishing mason — floor screeds, concrete finishing, kerbs and interlock paving.
  • Stone mason — natural stone cladding and features (on request).

Manpower supply

Typical masonry work we supply for

  • Blockwork for residential towers and villa communities (Dubai South, Aljada, Ras Al Khaimah coast)
  • Plaster and render ahead of painting
  • Tiling packages for apartments, hotels and retail fit-out
  • Repairs and refurbishment in occupied buildings — cracked plaster, re-tiling, patching after MEP work
  • External works: kerbs, interlock paving, boundary walls

Skills & checks

How we check masons before deployment

  • Reads architectural drawings and setting-out lines
  • Uses line, level and plumb correctly; checks wall verticality as work goes up
  • Knows mortar mixes and curing in UAE heat (plaster cracks if it dries too fast in summer)
  • For tile masons: lays to level with consistent joints, cuts cleanly around services, understands falls in wet areas

Manpower supply

Mason + helper ratios

Masons are most productive when someone else is mixing mortar and carrying blocks. A common setup is one helper for every one or two masons, depending on how far material has to travel. We price masons and their helpers together so you get one crew rate. Helper & General Labour Supply in Dubai & UAE →

Safety

Safety controls for masonry work

  • Dust — cutting blocks and tiles with wet methods or extraction; masks where dust can’t be controlled
  • Manual handling — block stacks kept close to the work; no overloaded wheelbarrows on ramps
  • Working platforms — proper trestles or scaffolds, never stacked blocks
  • Heat — external plaster and blockwork are outdoor work; midday break 12:30–3:00 PM, 15 June–15 September. Source: MOHRE

Pay & salaries

What do masons earn in Dubai?

For reference, 2026 Dubai job permissions registered with Pakistan’s Bureau of Emigration show block mason basic salaries of about AED 1,000–1,300 a month, excluding accommodation and transport. Source: BEOE Pakistan 2026 Your supply rate is different — it includes visa, insurance, accommodation, transport and PPE. Manpower Supply Rates in the UAE (2026) →

Hiring options

Hiring options

Hourly or daily (repairs, snagging) · Short-term (one floor or block) · Long-term (whole structure and finishes) · Night shifts in summer

FAQs

Frequently asked questions

Can’t find your answer? Contact our team or WhatsApp us.

What is the difference between a block mason and a plaster mason?

A block mason builds walls; a plaster mason finishes them. Some masons do both, but on productive sites they are usually separate crews.

Do you supply tile masons for fit-out projects?

Yes — for apartments, hotels and retail units.

Can you supply masons with helpers?

Yes. We price them together as one crew.

Do your masons work to drawings?

Yes. They work to setting-out lines and drawings issued by your engineer or foreman.

Can I hire masons for repair work only?

Yes, including small refurbishment and snagging jobs.

Coverage

Where we supply masons

Masons are available for sites in every emirate, on GFTS visas with WPS payroll. Each emirate page covers the areas we work in.

Block mason work: GFTS worker breaking out a concrete column during dismantling works in the UAE
Block mason work often starts with prep: breaking out a concrete column.
Block mason work: GFTS worker using a breaker to demolish a blockwork wall during a strip-out
Before the block mason starts: wall strip-out on a refurbishment.

Official sources: Dubai Media Office: MoHRE midday work ban 2026 · MoHRE: Wages Protection System

Looking for work rather than workers? Send your CV to gftsems@gmail.com. This page is for companies hiring supplied manpower.

Business enquiries

How many masons — and which kind?

Need a block mason, plaster mason or tile mason? Tell us the trade, headcount, location and start date. We’ll come back with a clear, itemised quotation.

WhatsApp